When a stack of drywall arrives at job site who is responsible for checking it in? The super, project manager, the installer?
When you have a 3300 sq ft house you are going to need a lot of drywall.
Where was the breakdown when each stack sat on the ground where there was your common white gypsum, a gray gypsum and a pink gypsum. The manufactures had to of known. The installer had to of noticed and the project manager who is liable would definitely know so what did they do back in 2004 when the construction materials shortage used whatever they could get their hands on and probably said," We'll figure it out later." and got the houses finished putting countless lives in jeopardy.
That is my opinion, hell it took Lennar 12 tries to paint our front and rear doors to our home before getting it somewhat right.
I know one thing is true and correct is we have nothing to loose because everything has been taken from us including all of our life savings, retirement plan, our health and everything we own is contaminated and cannot be saved.
No comments:
Post a Comment